Technician Utilization
Technician Utilization metric for Schedule Optimization refers to the average technician utilization for batch Schedule Optimization jobs. This can be measured for both individual technicians for a particular job and all the technicians for a particular date.
The following sections describe how these metrics are generated, when you configure Schedule Optimization Metric and click the Report Latest Job or Report Selected Job(s) button in the Execution tab of the configuration screen.
See Also:
Was this helpful?