About Defaults
The following default values are set:
Start date time of the first event:
Work Order Preferred Start Date Time if it exists.
OR
Gantt Start Date with Start Time as defined by group configuration setting SET052.
Duration of the first event is Work Order Service Duration if it is >0 seconds, otherwise it is taken from the group configuration setting SET002.
Start date time and end date time/duration for second and subsequent events are taken from the last added event.
All the date times are displayed as per your (logged in user’s) locale in Salesforce.
Event Subject:
Based on the applicable event subject rule, if the value of the group configuration setting SET057 is True.
Work Order Number, if SET057 is False.
All day checkbox is unchecked by default.