• You cannot directly add this task as a General Task linked to a Work Order. The option is available only on task added to a Work Plan associated with a Service Product.
• If you add a Work Plan that includes a Technical Attribute Template task type under General Tasks,the related technical attributes task are displayed in disable state. You can remove such tasks from work plan post assignment.
|



|
Field
|
Description
|
|---|---|
|
Fields with * are mandatory.
|
|
|
Task Name*
|
Enter a name for the task.
By default, The Task Name is updated as “Record Attributes”. You can modify it based on your requirements.
|
|
Mandatory Task
|
Select this checkbox if you want this task to be completed mandatorily as a part of the completion of work order.
|
|
Status Options
|
Select additional statuses based on the life cycle of the task. For example, In Progress.
Two values - New and Complete - are selected by default. You cannot remove these values.
|
|
Start Date Time
|
You can set the Start Date time of the task, or leave it blank.
|
|
Assigned To
|
Assign the task to a service group member or a service team. The following are the options:
• Assign to self: Click this option to assign the task to yourself. This option can be used by the service engineer executing the task.
• Assign to a Service Team Member: Select Service Team Member in the drop-down and then select a service engineer.
• Assign to a Service Team: Select Service Team in the drop-down and then select a service team.
|
|
Due Date
|
Select an intended completion date for the task.
|
|
Priority
|
Select the priority for the task.
|
|
Create labor line on Work Order when status is changed to complete
|
Select this checkbox to create labor lines after the task is completed. The Labor Lines are the Work Detail Lines of the Line Type, Labor, which include information about the service tasks and time consumed by technicians to complete those tasks.
|
|
Estimated Duration
|
Enter the estimated duration for the task in hours and minutes.
|
|
|
The process linked with the advanced task cannot be changed after it is saved. You must remove the task or create a new task if the task is no longer relevant.
|