Propose Time Error Codes and Messages
This section provides information about the message codes and custom messages displayed in the Propose time.
For details on Error codes, see Error Codes and Messages.
Type of Message
Code
Message
Error
-1
[General Error -1] : Could not start or complete the request. Retry before contacting system administrator with the error code.
-4
[General Error -4] : Could not start or complete the request. Retry before contacting system administrator with the error code.
-5
[General Error -5] : Could not start or complete the request. Retry before contacting system administrator with the error code.
-100
[General Error -100] : Could not start or complete the request. Retry before contacting system administrator with the error code.
-2
[Data Error -2] : Invalid, Insufficient, or Incomplete data.
-3
[Data Error -3] : Invalid, Insufficient, or Incomplete data.
-7
[Data Error -7] : No appointments times available to meet job requirements and scheduling constraints.
-8
[Data Error -8] : Insufficient resource capacity. Consider reducing jobs, including more resources, or selecting an optimization setting with longer scheduling horizon.
Violation
-403
[Data Error -403] : Invalid, Insufficient, or Incomplete data.
-404
[Data Error -404] : Invalid, Insufficient, or Incomplete data.
-408
[Data Error -408] : Invalid, Insufficient, or Incomplete data.
-409
[Data Error -409] : Invalid, Insufficient, or Incomplete data.
-411
[Data Error -411] : Invalid, Insufficient, or Incomplete data.
-412
[Data Error -412] : Invalid, Insufficient, or Incomplete data.
-502
[Data Error -502] : One or more fields have missing or invalid data value.
-503
[Data Error -503] : One or more fields have missing or invalid data value.
-512
[Data Error -512] : One or more fields have missing or invalid data value.
-540
[Data Error -540] : One or more fields have missing or invalid data value.
-101
[Violation -101] : This work cannot be scheduled due to a hard constraint violation. (for e.g. mandatory skill, mandatory or banned resource, overlapping schedule)
-102
[Violation -102] : This work cannot be scheduled due to a hard constraint violation. (for e.g. mandatory skill, mandatory or banned resource, overlapping schedule)
-104
[Violation -104] : This work cannot be scheduled due to a hard constraint violation. (for e.g. mandatory skill, mandatory or banned resource, overlapping schedule)
-120
[Violation -120] : This work cannot be scheduled due to a hard constraint violation. (for e.g. mandatory skill, mandatory or banned resource, overlapping schedule)
-103
[Violation -103] : Scheduled to a resource who may not be preferred for the work.
-106
[Violation -106] : The resource arrives on location early or before the the access hours of the work order or event.
-107
[Violation -107] : The resource arrives on location late or after the the access hours of the work order or event.
-109
[Violation -109] : Scheduled to a resource who may not have one or more skills that are optionally required for the work.
-121
[Violation -121] : Scheduled to a resource who may not be preferred or not have one or more skills that are optionally required for the work.
-110
[Violation -110] : Scheduled to a resource who may not be preferred for the work.
-111
[Violation -111] : Scheduling this work may have exceeded the maximum daily working hours, including overtime of the resource.
-112
[Violation -112] : Scheduling this work may have exceeded the maximum daily driving distance of the resource.
-114
[Violation -114] : Requires too much driving or overlaps with other assigned work. No other work have been assigned to that resource for that day.
-117
[Violation -117] : Scheduling this work may have exceeded the maximum daily working hours, including overtime of the resource.
-119
[Violation -119] : The work order can not be scheduled. Most likely no active routes are available
-418
[Violation -418] : Could not schedule the item without violating some of the scheduling constraints
-419
[Violation -419] : Could not schedule the item without violating some of the scheduling constraints
-420
[Violation -420] : Could not schedule the item without violating some of the scheduling constraints
-421
[Violation -421] : Could not schedule the item without violating some of the scheduling constraints
-500
[Violation -500] : Could not schedule the item without violating some of the scheduling constraints