Configuring MTTS Rule Sequence
Configure the order in which the rules must take precedence after you set up all the MTTS rules.
* 
MTTS rule is not dependent on Dispatch Process stamping, it is populated even when WO does not qualify for Dispatch Process
To define the sequence in which the rules are processed:
1. Click Rule Sequence in the MTTS Rules screen.
2. Arrange the rules as needed in the Sequence of MTTS Rules pop-up screen.
* 
The first matching rule in the list is applied first. If you have hierarchical rules, you must place the most granular rules at the top. For example, if Rule 1 uses City only, and Rule 2 uses Zip and City, Rule 2 must be moved before Rule 1. If you do not place the rules in this order, Rule 2 is never considered for determining the MTTS of a work order.
Was this helpful?