Metric Name
|
Derived From
|
Save As
|
---|---|---|
First Time Fix
|
WorkOrder
|
SPM- First Time Fix
|
Mean Time To Repair
|
Work Detail and Work Order
|
SPM- Mean Time To Repair
|
Contract Up Time
|
Service/Maintenance Contract, CoveredProduct, Work Order, and DownTime
|
SPM- Contract Up Time SPM– Down Time Detail
|
Attach Rate
|
Installed Product
|
SPM- Attach Rate
|
Mean Time To Complete
|
Work Order
|
SPM– Mean Time To Complete
|
Average Response Time
|
Work Order
|
SPM– Average Response Time
|
Utilization
|
Timesheet, Timesheet Daily Summary, Time Entry, Technician/Equipment
|
SPM– Utilization
|
Repeat Visit
|
Work Order
|
SPM– Repeat Visit
|
Mean Time Between Failures
|
Installed Product
|
SPM– Mean Time Between Failures
|
Account Summary
|
SPM- First Time Fix, SPM- Mean TiIme To Repair, SPM- Attach Rate, SPM- Contract Up Time, SPM Mean Time To Complete, SPM- Average Response Time, SPM- Repeat Visit
|
SPM Account Summary
|