Scheduling
>
Dispatch Console
>
Using Dispatch Console
>
Using Work Order Grid
>
About Work Order Drag and Drop
> About Drag and Drop on Gantt
About Drag and Drop on Gantt
You can create a new event for a work order by dragging the work order from the grid and dropping it in Gantt against the required technician, at the desired date time. This launches the
New Event window
.
Was this helpful?
This site works best with JavaScript enabled