Editing Non-Work Order Event
You can edit an existing non-Work Order event by launching the event edit window as follows:
Double-click the event in the Scheduler
OR
Drag the event in the Scheduler to the required technician and/or date time
This window has the same features as the new event window, except that defaults are not applied.
Overlap check is applied similarly to how it is applied during new event creation based on the same configuration settings if the value of the global configuration setting SET027 is Disallow.
Was this helpful?