All the existing Output Documents for any of the following objects are listed: • Work Order • Installed Product • Location • Account |
Fields | Description | ||
---|---|---|---|
Fields with * are mandatory. | |||
Task Name* | The name of the Output Document you have selected is populated as the task name by default. However, you can change the name.
| ||
Status Options | Select the statuses the task can transition into. Two status options — New and Complete — are selected by default. | ||
Estimated Duration | Enter estimated time to complete the task. | ||
Estimated Time Unit | Select the unit of time for the Estimated Duration field value from the dropdown list. | ||
Mandatory Task | Select this checkbox if you want this task to be completed mandatorily as a part of the completion of work plan. | ||
Details | Add instructions that you want to provide to the service engineer executing the task. You can add photos, bullets, numbered list, and so on. |
• You can add multiple files. However, the total size of the attached files must not exceed 800 MB. • All the supported file types with Salesforce are supported. |