Configuring Bottleneck Analysis with Work Center Demand
If you know the total demand for your work centers, you can configure bottleneck analysis for a demand window using manually entered work center demand. In this configuration scenario, DPM calculates the TAKT for each work center based on the total demand value that you provide, or you can manually the enter the TAKT values.
To configure a demand window that calculates bottleneck impact using the total demand that is specified on each work center, complete the following steps:
1. In
Site Demand, select a site and
create a demand window. For the
Demand Setting, select
Set on Work Centers.
2. In Equipment List, navigate to a work center in the same site for which the demand window was created.
5. Repeat steps 2 through 4 on each work center with demand for this demand window.