Scheduling Revaulting from the Vault Configuration Window
For background information about revaulting, see About Revaulting.
To schedule revaulting:
1. From the Vault Configuration window, select a file vault and then select Objects > Revaulting or click icon.
2. Select a start time:
Immediate—Revaulting will begin as soon as possible.
On Schedule—Revaulting will begin at the date and time that you specify.
3. Select a frequency:
Once—Revaulting will occur only once.
Periodic—Revaulting will occur periodically at the interval that you specify. The default interval is every day (that is, every 24 hours).
* 
It is recommended that you set revaulting to occur periodically beginning at a date and time that you specify. Use the On Schedule and Periodic options to accomplish this.
4. Click OK.
You can create more than one revaulting cycle for a vault. There are situations when this might be necessary, such as when a mounted drive that contains a file vault mount is temporarily unavailable during the revaulting process. In this case, you may want to perform revaulting using the Immediate and Once options.
Isto foi útil?