SPM Schedule Tech Utilization Constraints
SPM Schedule Tech Utilization Constraints records are created from Scheduling Job Summary records associated with the selected / latest Schedule Optimization job(s).
One SPM Schedule Technician Utilization Constraints record is created per source record, with JobId field as the primary key. Important mapping details related to the Overall Drive Time metric apart from the other technician utilization metrics are as follows:
Target Field
Value Derived From
Dispatch Process Name
JobId > SVMX Process > Name
Horizon End Date
Calculated based on JobId > SVMX Process > Planning Time Horizon configuration, as processed by the Schedule Optimization engine
Horizon Start Date
Calculated based on JobId > SVMX Process > Planning Time Horizon configuration, as processed by the Schedule Optimization engine
Overall Drive Time
Total drive time in all the schedules returned for the job by the Schedule Optimization engine
After a target record is created, there are no overrides and no re-examination. This means that if a target record exists for a job already, it is not updated and that job is not processed again.
See Also:
Was this helpful?