Purge Tab
You can choose to purge on demand the generated metrics and their related data from this tab. Use this option to permanently delete the records which are no longer required.
You can perform the following actions in this tab:
Purge Latest job: You can click this button to delete the Schedule Optimization Metrics data generated previously for the latest Schedule Optimization job run. These include records of objects SPM Scheduling Technician Utilization, SPM Schedule Tech Utilization Constraints, Scheduling Job Summary, and Scheduling Event Summary. Latest job is identified as the latest successfully completed job of any dispatch process of method Optimized Batch.
Purge Job(s) By Timeframe: You can use this option to delete the Schedule Optimization Metrics data generated previously for specific job(s). Following are the options allowed for filtering the jobs:
Start Date and End Date: The date range within which the successfully completed Schedule Optimization jobs have to be listed.
Dispatch Process Name: Name of the dispatch process for which above date range is applied to filter the jobs, or All to filter the jobs of all the Optimized Batch method dispatch processes in the org.
Filter the required jobs using the above criteria, select the required jobs, and delete the metrics by clicking the button Purge Selected Job(s).