Data Model > Data Dictionary > Functional Objects > C > Change Order Line
Change Order Line
This object is a repository for the search result lines generated from a Field Change Order (FCO) Search on a Change Order record. Lines may connect the Change Order to an Installed Product, Stocked Serial, or Batch/Lot record. Change Order lines also connect to Work Orders generated from the FCO results through the FCO Console.
API Label: SVMXC__SM_Change_Order_Line__c
No. of Fields: 18
Field Label
Field Name
Data Type
Description
Custom Relationship Fields
Batch/Lot
SVMXC__SM_Batch_Lot2__c
Lookup(Batch/Lot)
This field is used to associate the Change Order Line with Batch Lot.
Case
SVMXC__SM_Case__c
Lookup(Case)
This field is used to associate the Change Order Line with Case.
Change Order
SVMXC__SM_Change_Order__c
Master-Detail(Change Order)
This field is used to associate the Change Order Line with Change Order.
Change Order Log
SVMXC__SM_Change_Order_Log__c
Lookup(Change Order Log)
This field is used to associate the Change Order Line with Change Order Log.
Installed Base Notification
SVMXC__SM_IB_Notification__c
Lookup(Installed Base Notification)
This field is used to associate the Change Order Line with Installed Base Notification.
Installed Product
SVMXC__SM_Installed_Product__c
Lookup(Installed Product)
This field is used to associate the Change Order Line with Installed Product.
Opportunity
SVMXC__SM_Opportunity__c
Lookup(Opportunity)
This field is used to associate the Change Order Line with Opportunity.
RMA/Shipment
SVMXC__SM_Parts_Order__c
Lookup(Parts Order)
This field is used to associate the Change Order Line with RMA/Shipment.
Stocked Serial
SVMXC__SM_Stocked_Serial__c
Lookup(Stocked Serial/Batch Detail)
This field is used to associate the Change Order Line with Stocked Serial.
Work Order
SVMXC__SM_Work_Order__c
Lookup(Work Order)
This field is used to associate the Change Order Line with Work Order.
Standard Fields
Record Number
Name
Auto Number
The auto-generated record number.
Custom Fields
Batch/Lot Number
SVMXC__SM_Batch_Lot_Number__c
Formula (Text)
This field is used to display Batch Lot Number from associated Stocked Serial/Batch Lot/Installed Product.
Delivery Method
SVMXC__SM_Delivery_Method__c
Picklist
The delivery method field indicates the intended output generation for a change order line record. This field value will inform the Output Generation backend process what kind of record to generate when delivering the Change Order Line.
Generate Work Order?
SVMXC__SM_Generate_WORD__c
Checkbox
This field is used to indicate whether the Work Order needs to be created from the Change Order Line.
Line Status
SVMXC__SM_Line_Status__c
Picklist
This field is used to indicate the status of the Change Order Line.
Location
SVMXC__SM_Location__c
Formula (Text)
This field is used to display Location from associated Installed Product or Product Stock of associated Stocked Serial.
Serial Number
SVMXC__SM_Serial_Number__c
Formula (Text)
This field is used to display Serial Number from associated Installed Product/Stocked Serial.
Work Plan JSON
SVMXC__SM_WorkPlanJSON__c
Long Text Area(10000)
This field stores one or more Work Plans assigned to the Change Order Line. Upon generating Change Order Lines, Work Plan field values are auto-populated into this field from the Work Plan field in the FCO Header record, where appropriate. This field value can be modified by a user.
Was this helpful?