Business Data Generation
Applies to timesheets, as shown below:
Qualify the timesheet for Utilization processing by setting the appropriate field values, so that it matches the timesheet expression configured in SPM Setup.
Ensure that the Type field in time entry (whose values are configured to indicate Non-Productive Time & Leaves as mentioned above) is populated with a valid value.
Ensure that the Break Hours or Break Duration field is populated in Technician/Equipment records with appropriate values, to reflect the total break time.
Was this helpful?