Sottoprocesso Arbortext PE Pool Work Thread
Each Sottoprocesso Arbortext PE pool starts a background work thread that runs periodically and attempts to perform routine maintenance. The interval between runs is configured in the workThreadInterval attribute of each SubprocessPool element in e3config.xml. The default is every 5 seconds. Each time it runs, a work thread checks for the following items. Descriptions of each item follows.
• unusable Sottoprocessi Arbortext PE
• Sottoprocessi Arbortext PE that should be terminated
• Sottoprocessi Arbortext PE that have exceeded the allowed idle or lifetime period
• deferred requests to delete directories
• whether a new Sottoprocesso Arbortext PE should be started
Parent topic