Terminating Expired Sottoprocessi Arbortext PE
Each time the work thread runs, it examines idle
Sottoprocessi Arbortext PE in its pool. If any idle
Sottoprocesso Arbortext PE is older than the configured
maxLifetime period (explained in
The maxLifetime Attribute), the work thread terminates the
Sottoprocesso Arbortext PE.
In addition, if the longest idle Sottoprocesso Arbortext PE has been idle longer than the configured maxIdleInterval period, the work thread terminates that one as well, provided there are more than the minimum number of Sottoprocessi Arbortext PE running.
In either case, if the number of activated
Sottoprocessi Arbortext PE drops below the minimum configured number of
Sottoprocessi Arbortext PE (explained in
The minSubprocesses and maxSubprocesses Attributes), the work thread starts a new
Sottoprocesso Arbortext PE.
Parent topic