Starting New Sottoprocessi Arbortext PE
A new Sottoprocesso Arbortext PE can be started when the request load increases and there are fewer than the configured maximum number running. In addition, the pool work thread checks whether the configured minimum number of Sottoprocessi Arbortext PE are running. If fewer than the minimum number are running, the work thread starts another Sottoprocesso Arbortext PE.
Parent topic