Verifying RBD Data
You can validate the construction and setup of one or more block diagrams in the RBD Table. While no validation is performed on phase diagrams, validations of the block diagrams to which it links is possible.
2. Complete this window and click OK. Any previously existing warnings for the diagrams to verify are deleted. The Verifying RBD Data window opens, displaying the progress made as verifications are run. To stop the verification process, in this window, you can click Stop.
When the process finishes, the status indicator reads 100%. The
RBD Warnings window then opens. For more information, see
RBD Warnings Window.
3. When finished viewing the warnings in this window, click the X in the upper right corner to close it.