Time-Independent Measures
The following table lists RBD time-independent measures and references the topics providing the equations for calculating these results where necessary.
Result
Equation Reference
Cost of Configuration
---
MTTF (MTTFF)
Cut Sets
---
Path (Tie) Sets
---
Optimal Number of Spares (corresponding to specified goals and constraints)
---
Furthermore, confidence interval calculations are supported for the RBD results listed in the table below.
Result
Equation Reference
MTBF
MTTF
Reliability
Availability