Windchill Risk and Reliability Module
|
Limit
|
||
---|---|---|---|
ALT
|
50 data sets
|
||
100 data points over all data sets
|
|||
Event Tree
|
10 events
|
||
FMEA
|
30 items over all FMEA trees
|
||
100 FMEA Worksheet table line items, which include any combination of items, modes, causes, and effects, over all FMEAs in the System file
|
|||
20 control plans
|
|||
20 DVPs (design verification plans)
|
|||
20 records per subtable
|
|||
FRACAS
|
20 system tree items
|
||
20 incidents over all system tree items
|
|||
20 maintenance logs across all incidents
|
|||
20 operating time records
|
|||
20 problem records
|
|||
20 records per subtable
|
|||
FTA
|
20 gates and events over all fault trees
|
||
LCC
|
10 cost breakdown structure items
|
||
Maintainability
|
30 system tree items
|
||
30 FD&I items and 30 tasks in the Project’s Maintainability FD&I and Task files
|
|||
Markov
|
10 diagrams
|
||
10 states across all diagrams
|
|||
10 transitions across all diagrams
|
|||
Prediction
|
30 system tree items
|
||
20 records per subtable
|
|||
RBD
|
For block diagrams:
|
||
10 diagrams
|
|||
20 blocks across all diagrams
|
|||
For phase diagrams:
|
|||
10 diagrams
|
|||
10 blocks across all diagrams
|
|||
|
|||
Weibull
|
50 data sets
|
||
100 data points over all data sets
|