Use the following procedure to add a plan object to the timeline from the Timeline toolbar:
1. From the Timeline table, click the edit timeline icon .
2. The Modify Timeline window displays two columns. The left column displays all of the available plan objects in the plan.
3. Select the plan object you want to add to the timeline.
4. Click Add to move the object to the right column which displays all objects to be used in the timeline.
5. Click OK.