Integration with Other Applications > Windchill Workgroup Manager Documentation > Cadence Team Design Option > Project Integrator Tasks > Design Preparation
  
Design Preparation
As the project integrator, before handing over a design to a project team, you must ensure that the design is “team ready” by performing a few important preparation tasks.
The tasks listed in the following table must be completed in order. For complete details, click the link in the Task column and refer to the procedure.
Task
Description
Checks the design top-level block out to begin the team design preparation process.
Creates an initial BOM attribute map for the design.
Modifies the BOM attribute map for the design.
Checks the design top-level block back in to persist the links between the design objects and the BOM attribute map.