Additional Windchill Capabilities > Manufacturing Process Management > Windchill MPMLink Overview > MPMLink Explorers > About the Process Plan Explorer > About Process Plan Explorer Tabs > Related Tab > Constrained Operations Table
  
Constrained Operations Table
The Constrained Operations table appears on the Related tab when an operation is selected in the navigation pane. This table can be used to manage the time constraints that can be set between the selected operation and any other operation in the selected process plan.
The attributes that appear in the table are described below:
Attribute
Description
Operation
The operation being constrained.
Name
The name of the constraint.
Number
The number of the operation being constrained.
Operations Holder
The parent of the operation being constrained.
Constraint Type
The type of constraint being applied to the operation (for example, Start to End).
Lag
The time delay between constrained operations (for example, to allow for drying).
Required
Indicates whether the constraint is mandatory or not.
Available Actions
The following table explains the actions available from the toolbars on this table:
Constrained Operations Tool Bar
Icon
Action
Description
Add Constrained Operation
Opens the Add Constraint window where you can add a constraint to the selected operation.
Remove Constrained Operation
Removes the selected constraint from the operation.
Paste
Places a constraint from the clipboard into the selected location.
Column Details
Opens the Column Details window, which can be used to configure the columns displayed in the table.