Manufacturing Resource Browser Task Tabs
The task tabs located in the right pane of the Manufacturing Resource Browser display information pertinent to the resource object selected in the left-side structure pane.
* 
The task tab collection that appears is dependent on the type of object selected in the structure pane.
The following table provides a general usage description for each tab that may appear in the pane.
Tab Name
Description
Attributes
View or change attributes of the selected manufacturing resource.
Compatibility
Use to manage links between a selected resource and manufacturing standard capability, or another manufacturing resource.
Uses
Use to associate additional resources to the resource selected from the structure pane on the left (for example, to add a work center to a plant).
Process Plan Localization
Formula Set
Used to select pre-defined MPMLink standard formula sets that can be used to calculate the time and cost associated with a work center. For example, a standard time and cost formula, and a periodic time and cost formula.
Classification
Documentation
Use to view, add, change, or remove resource document associations (alternates and substitutes).
Equivalent
Use to display and modify the equivalent part information of the resource selected in the tree structure display.
Plants
Used to manage a plant's association to the selected object.
Manufacturing Standard Selection
Read only tab used to select manufacturing capabilities or standard procedures that would be associated with the selected resource.
Resource Selection
Read only tab used to select resources that would be associated with the selected resource.
Alternate Units
Displays a list of Alternate Units for an object. Alternate units are a way of defining a different unit for an object other than its default unit.
Distribution Targets
Identifies the distribution targets that receive data sent from your PDM system.
* 
Although the structure pane allows multi-selection, the tabs can only show the information associated with one object at a time. As a result, the information in the task tabs represents the last selected object only.