Release Notes > ThingWorx Operator Advisor 8.5.2 Release Notes
ThingWorx Operator Advisor 8.5.2 Release Notes
Upgrading to 8.5.2
After following the instructions found in Upgrading Operator Advisor that are appropriate for your source system, complete the following steps:
1. Migrate your data:
a. In ThingWorx Composer, navigate to the PTC.SCA.SCO.OAMigrator thing.
b. Under Services, execute the service applicable for the release from which you upgraded:
MigrateFrom_8_5_0_To_8_5_2
MigrateFrom_8_5_1_To_8_5_2
The service has completed successfully when "No results" displays in the service output pane.
2. Update the MPMLink OData connector thing:
a. Navigate to the MPMLink OData connector thing (PTC.SCA.SCO.MPMLink_ODataConnector).
b. Click Configuration.
c. In the OData Connector Connection Settings configuration table, update the Service Root Relative URL values to appear as follows:
/v3/MfgProcMgmt
/v4/ProdMgmt
/v2/NavCriteria
d. Under HTTP Connector Connection Settings, update the Relative URL value from /servlet/odata/v1 to /servlet/odata (remove the /v1), if needed.
e. Create a duplicate of the updated MPMLink OData connector thing (PTC.SCA.SCO.MPMLink_ODataConnector), and configure it for your system as instructed in Configuring the MPMLink OData Connector.
Enhancements
In addition to bug fixes, ThingWorx Operator Advisor 8.5.2 includes the following enhancements:
Enhancements
Compatibility
ThingWorx Operator Advisor 8.5.2 is included in the ThingWorx Apps 8.5.2, which is compatible with ThingWorx 8.5.2. For more information, see the ThingWorx Apps 8.5.2 Release Notes.
ThingWorx Operator Advisor 8.5.2 supports Windchill REST Services (WRS) 1.7 and specific domain versions. For more information, see Product Requirements and Windchill REST Services Domains Used in Process Plan Conversion.
Process Plan Conversion Enhancements
When converting an Windchill MPMLink process plan, you can now supply navigation criteria to convert only those parts of the process plan structure that are of interest. For more information, see Converting Process Plans from Windchill MPMLink and Using Navigation Criteria in Process Plan Conversion.
Process plan conversion now includes both allocated parts and operated-on parts. Enumeration values for the MaterialUse property on work definition material specifications have been added to support both allocation types. For more information, see Work Definition Material Specification Properties and Updating Material Use Values.
Work Instructions Screen Enhancements
The work instructions screen (PTC.SCA.SCO.UnifiedWorkInstructionsScreenMashup) now includes a list of the materials associated with the selected step in the work instructions.
For work instructions that were converted from Windchill MPMLink in occurrence mode, cross-selection highlighting is supported between the materials list and the CAD diagram. Selecting a row in the materials list highlights the related part in the CAD diagram. Selecting a part in the CAD diagram highlights the related part in the materials list. The cross-selection highlighting functionality is supported only for data that is converted in 8.5.2 or later.
For more information, see Work Instructions Example Implementation.
Known Issues
The following known issues are present in ThingWorx Operator Advisor 8.5.2:
Known Issue
Solution
Viewing mashups directly from within ThingWorx Composer for the first time can result in a message saying that the user does not have a valid licence.
Workaround: Reload the mashup.
This issue will be addressed in a future release.
When ThingWorx and Operator Advisor are configured for SSO authentication, downloads or attachments (such as images or videos) that are fetched directly from Windchill by URL do not display.
This issue will be addressed in a future release.
Options navigation criteria does not filter process plans as expected during conversion when operations are "overloaded". Overloaded operations have expressions assigned to resources within the operation, such as tools or equipment, for more than one variant filter.
Overloaded process plans, where expressions are assigned to the operations themselves, rather than to resources within the operations, are filtered as expected during conversion.
When switching between tabs on the PTC.SCA.SCO.UnifiedWorkInstructionsScreenMashup, the ThingView Widget actions on the CAD tab can become unresponsive.
For more information, see Work Instructions Example Implementation.
Refresh the browser window.
Was this helpful?