What's new in Integration for IBM Rational DOORS (Integration for IBM Rational DOORS)
What was new in integration for IBM Rational DOORS 9.0
The Integration for IBM Rational DOORS provided with Integrity Modeler 9.0 includes the following enhancement:
• You can now choose whether the Default View is updated as part of the synchronization.
What was new in Integration for IBM Rational DOORS 8.5
Integration for IBM Rational DOORS 8.5 does not include any significant changes.
What was new in Integration for IBM Rational DOORS 8.4
• You can now integrate with IBM Rational DOORS using OSLC.
Tell me more...
• The DOORS and Integrity Synchronizers now support additional SysML 1.3 traceability links.
What was new in Integration for IBM Rational DOORS 8.3
• On the Requirement Options and Traceability page, you can now select which item types are included in the synchronization (previously they were all included).
Tell me more...
• Extensions of Requirements and Enterprise Goals are now synchronized.
• New option for importing diagrams as bitmaps or metafiles.
Tell me more...
• When you synchronize Event Action Blocks, you can now synchronize their Guard Conditions.
What was new in DOORS Synchronizer 8.2
This section provides information about what was new in DOORS Synchronizer 8.2:
• The previously named DOORS Synchronizer is now called PTC Modeler Integration for IBM Rational DOORS.
• The labels used in the user interface have been rebranded to reflect Studio being rebranded to Modeler.
• Note that the following Stereotypes and Tag Definitions have been renamed (through aliases) in the SysML Profile: the «DOORSItem» stereotype now appears as «SynchronizedItem», the isDeletedInDoors tag definition now appears as isDeletedInRequirementTool, and the isInDOORS tag definition now appears as isInRequirementTool.
What was new in DOORS Synchronizer 8.1
This section provides information about what was new in DOORS Synchronizer 8.1.
DOORS Synchronizer 8.1 does not include any significant changes.