Building Blocks
>
Solution-Specific Building Blocks
>
Production Dashboard Building Block
> Post-Deployment Steps (Production Dashboard Building Block)
Post-Deployment Steps (Production Dashboard Building Block)
All deployment is handled by the
PTC.ProductionDashboard.EntryPoint
Thing. There are no additional post deployment steps for the production dashboard building block.
Was this helpful?
This site works best with JavaScript enabled