Manufacturing > Process Manager > Working with the Process Table > To Specify Prerequisites for a Step
  
To Specify Prerequisites for a Step
Specifying prerequisites for a step means selecting the step or steps that must be performed before the current step. Step prerequisites are specified for information purposes only. After setting the prerequisites for a step, if you move a step within the process table in such a way that the set prerequisites no longer hold true, then a warning symbol () appears in the Prerequisite section of the Process tab. Use the View Builder to add the Prerequisite Status field column to the process table.
1. When editing a Milling or Holemaking step, click . The tab for the selected step opens.
2. Click Process.
3. Click in the Prerequisites section and select a step from the process table. The selected step becomes a prerequisite for the step that you are editing.
4. To remove an existing prerequisite, right-click its name in the Prerequisites box and click Remove.
5. Click when finished.