Installation and Upgrade > Windchill ESI > Installing and Configuring Windchill ESI in an SAP Environment > Creating ESI User Accounts and Configuring SAP for Windchill ESI > Configuring the Availability Check Default Value for Different Material types in Specific Plants
  
Configuring the Availability Check Default Value for Different Material types in Specific Plants
The following process describes how to set the Availability Check default values for materials in a specific plant:
1. Login to SAP. Use the transaction /NSPRO
* 
You must have the required privileges to customize the SAP instance.
2. Select the SAP Reference IMG option and navigate to:
Sales and Distribution- > Basic Functions- > Availability Check and Transfer of Requirements > Availability Check- > Availability Check with ATP Logic or Against Planning
3. Select Define Checking Groups Default Value.
This will display the default values for Availability Check for a given material for a specific plant.
4. In order to set the default value for a given plant and specific material type, select the New entries option.
For example, to set the Availability check value of 01 viz.. Daily requirements for material type description Finished product (FERT) in plant 1400 use the following procedure:.
1. Specify the 'Matl type' from list (For example, FERT).
2. Specify the plant from list (For example, 1400).
3. Select the required availability value (For example, 01).
4. Repeat steps 1 through 3 for all required values.
5. Save the settings.