Option
|
Description
|
---|---|
Total cost
|
The sum of all costs in the system over the mission time. This includes initial configuration cost, spare cost, miscellaneous cost, labor cost, and downtime cost.
|
Labor cost
|
The total labor costs over the mission time. This cost is based on the fixed and variable costs associated with a repair resource. For each use of a repair resource, fixed call-up costs and variable hourly pay rate costs are accrued. Thus, the cost of labor depends on the repair resources, the frequency of their usage, and the duration of their usage.
|
Miscellaneous cost
|
The total miscellaneous costs over the mission time. These costs include the fixed costs resulting from the miscellaneous costs that are incurred during maintenance and the costs associated with the repair shop.
|
Spare usage cost
|
The costs of spares purchased over the specified mission time. This value includes the initial number of spares.
|
Spare storage cost
|
The total cost of onsite and offsite spares storage over the mission time.
|
Downtime cost
|