Property
|
Description
|
---|---|
Fixed cost per system failure
|
The fixed costs associated with a system failure. For repairable systems, these costs are applicable each time a failure of the system occurs.
|
Downtime dependent costs for the system
The properties under this heading provide for specifying the costs per hour for not meeting the required capacity.
|
|
Fixed cost for not meeting required capacity
|
The fixed costs per hour for not meeting the required capacity.
|
Cost per percentage of capacity below 100%
|
The cost per hour incurred for each percentage of capacity below 100% capacity. For example, if you enter a value of 20, and the system is running at 95% capacity, a cost of 100 is incurred per hour. This is because the system is running at 5 percentage points below 100% capacity; thus, the cost is 5 * 20 or 100.
|
Cost per percentage of capacity below requirement
|
The additional cost per hour incurred for each percentage of capacity below the required capacity. For example, if you enter a value of 50, and the system is running at 85% when the required capacity is 90%, a cost of 250 is incurred per hour. This is because the system is running at 5 percentage points below the required capacity; thus, the cost is 5 * 50 or 250.
|