Section
|
Main Activities Scored
|
Phase Contributions: FIDES 2009
|
Phase Contributions: FIDES 2004
|
---|---|---|---|
Specification
|
• Specification of requirements by the instructing parties
• Formalizing of system requirements
• Definition of the architecture
• Attribution of system requirements
• Formalization of subassembly requirements
|
8
|
8
|
Design
|
• Feasibility/Preliminary design
• Detailed design
• Testing and fine-tuning
• Qualification
• Preparation for production
• Preparation of logistic support
|
16
|
16
|
Manufacturing (FIDES 2009 version)
OR
Production (FIDES 2004 version)
|
• Storage
• Reception/Input check
• Assembling of subassemblies
• Testing of subassemblies
• Equipment integration
• Environmental stress screening of subassemblies and equipment
• Acceptance of subassemblies
• Equipment delivery
|
20
|
24
|
Equipment Integration (FIDES 2009 Only)
|
• Testing of system
• Corrective actions
• Packaging
• Storage
• Certification
• Training
• Reliability measurement
• Component and supplier selection
|
10
|
--
|
System Integration
|
• Reception/input check
• Storage
• Testing of system
• Environmental stress screening of system
• Acceptance of system
• Equipment delivery
|
10
|
12
|
Field Operation and Maintenance
|
• Transfer to the user
• Operational use
• Sustained readiness support
|
18
|
20
|
Support Activities
|
• Management of subcontractors
• Management of reliability, procurement, and incidents
• Management of the quality system and resources
|
19
|
20
|