Information
|
Description
|
---|---|
Cost breakdown structure (CBS)
|
The hierarchical tree structure of the system cost elements to analyze.
|
Alternatives
|
Additional system designs to analyze to determine which design is the most cost-effective. Alternatives are specified in the Alternatives pane in the Project’s LCC Variables file. For more information, see LCC Variables Files
|
Time Intervals
|
The time intervals over which costs are determined. Time intervals are specified in the Time Intervals pane in the LCC Variables file.
|
Cost Equation Variables
|
The equations for calculating the costs associated with a CBS element.
|