Workflow 2: Incorporating Changes to Parts Associated with Change Objects Using Set Configuration Specification
Let’s consider that a design engineer made few modifications to certain parts that are associated with a change task or change notice in eBOM. As a manufacturing engineer, you want to incorporate or propagate those changes to manufacturing BOM. This workflow is a sample of the basic steps to incorporate the above-mentioned changes:
1. Select the root part of an assembly form the folder browser page or search results page.
2. Right-click the selected part and select > . The structure opens in BOM Transformer.
3. Click
Set Configuration Specification. The
Set Configuration Specification dialog box opens. Specify the change task or change notice number in the
Change Number field.
4. By specifying the change number, you are setting the context for reconciliation. In other words, you are doing the groundwork for using the
Detect Discrepancies and
Review and Resolve Discrepancies action. Consider the following scenario: The part structure you have opened contains 500 parts. Only 10 parts in the structure are associated with the specified change number. Specifying the change number helps to ensure that discrepancies are detected for only those 10 parts that are associated with the change number.
5. Select the Apply Change Notice/Task Filter check box. By selecting this checkbox, you make sure that only the parts that are associated with the specified change task or change notice number in step 4 appear in the tree structure.
6. Click OK.
7. Click
Detect Discrepancies. The changed parts in eBOM are highlighted and the
Review and Resolve Discrepancies dialog box opens. The
Review and Resolve Discrepancies dialog box lists all the discrepancies for the highlighted parts.
8. Optionally, use the
or
actions in the
Review and Resolve Discrepancies dialog box toolbar to move to the next or previous discrepant part in the upstream tree structure.
9. Select the check boxes for the discrepancies that you want to resolve.
10. Click
Propagate changes to downstream. The selected discrepancies are resolved.