Additional Windchill Capabilities > Manufacturing Process Management > Windchill MPMLink Overview > MPMLink Browsers > Using the Process Plan Browser > Process Plan Browser Task Tabs > Standard Procedures Tab
  
Standard Procedures Tab
Use the Standard Procedures tab to view and add standard procedures, as well as manage the resources allocated to a standard procedure. Different options are available, depending on the object selected in the structure pane.
Available Actions
The following table explains the actions available from the toolbar on this tab:
Standard Procedures Task Toolbar
Icon
Action
Description
Insert Existing
Adds an existing standard procedure to a control characteristic. A link is created between the standard control characteristics tab to operation.
Insert New
Adds a new standard procedure. A link is created between the standard control characteristics tab to operation.
Remove Standard Procedure
Removes the selected standard procedure from the part or operation to which it was allocated.
Copy
Copies the selected standard procedure to the clipboard.
Paste
Moves the standard procedure on the clipboard to the designated location.
Attributes in Standard Procedures Tab
The following attributes are present in the Standard Procedures tab of Process Plan Browser:
Number
Name
Category
Version
Link to Standard Control Characteristic
When a control characteristic is linked to an operation, the standard procedure is copied from the standard control characteristic to operation link.