Resyncing Members With Deferred Operations
When you resynchronize a member associated with a deferred operation, PTC RV&S performs the following deferred operations:
• Deferred Add
When resynchronizing a member associated with a deferred add, PTC RV&S does not make any changes to the working file.
• Deferred Drop
When resynchronizing a member associated with a deferred drop, where the working file is modified, PTC RV&S asks you if you want to overwrite the existing working file.
• Deferred Rename
When resynchronizing a member associated with a deferred rename, PTC RV&S asks you if you want to overwrite the existing working file. If the new working file is missing, PTC RV&S resynchronizes it. The working file with the old name is then deleted from the Sandbox.
• Deferred Move
When resynchronizing a member associated with a deferred move, PTC RV&S informs you that there is a deferred operation on the member and asks you if you want to proceed. PTC RV&S then resynchronizes the working file to the version in the project and in the new location. The deferred indicator remains after the resync completes.
• Deferred Checkin
When resynchronizing a member associated with a deferred checkin, PTC RV&S asks you if you want to overwrite the existing working file to correspond to the member revision.
• Deferred Update Revision
When resynchronizing a member associated with a deferred update revision, PTC RV&S asks you if you want to overwrite the existing working file.
• Deferred Import
When resynchronizing a member associated with a deferred import, PTC RV&S asks you if you want to delete the existing working file.