User Help > Working With Documents > Branching Documents > To branch an individual document from the Document menu
To branch an individual document from the Document menu
1. Select the root of the document that you want to branch and select Document > Branch. The Branch window opens.
2. For Select a Destination Project, select the project you want the branched document to be a part of.
3. For As Of, select an option for associating the branch with a specific point in time.
The following table lists the As Of options for branching documents.
To branch a document As Of...
Do this...
Now
Select Now to branch the current version of the document.
Revision
Select Revision. A list of applicable revisions is shown. You can type some text in the Show revisions containing text box to display branches containing specific text.
Branch
Select Branch. A list of applicable branches is shown. You can type some text in the Show items containing text box to display branches containing specific text.
Label
Select Label. A list of labels associated with the item displays.
Select the label you want to branch the item as of.
* 
This option is unavailable if a document has not been labeled or baselined at least once.
Edit
Select Edit. A list of user names associated with modifications to the document displays.
Select the user name and details you want to create the branch as of.
Date
Select Date. A calendar displays, allowing you to select a date to branch the document as of. The document must have existed at the date and time you select or else you will get an error.
* 
When branching a document based on a point in the past, subsegments are replaced by a shared item that has an “As Of” hyperlink to the segment root.
4. Click OK. The Item Details for the branched document displays.
* 
When you branch a document it creates a copy of an entire document without copying the actual text content, linked images, or attachments. The text content is shared from the original document.