Items
|
OData Entities
|
Description
|
---|---|---|
Process Plan
|
ProcessPlan
StandardProcedure
|
The ProcessPlan entity represents the version of a process plan. In Windchill, the MPMProcessPlan and MPMProcessPlanMaster classes are used to work with process plan versions.
The StandardProcedure entity is derived from the ProcessPlan entity. StandardProcedure represents an instance of MPMProcessPlan class, where standard attribute is set to true.
|
Operation
|
Operation
|
The Operation entity represents the version of an operation. In Windchill, the MPMOperation and MPMOperationMaster classes are used to work with operation versions.
|
Sequence
|
Sequence
|
The Sequence entity represents the version of a sequence. In Windchill, the MPMSequence and MPMSequenceMaster classes are used to work with sequence versions.
|
Bill of Process
|
BOP
OperationHolder
OperationHolderUsageLink
|
The BOP entity represents the process plan structure. BOP is an operation structure, which is expanded to the required number of levels.
The OperationHolderUsageLink entity represents the association between parent and child parts in OperationHolder entities.
In Windchill, the MPMOperationUsageLink, MPMSequenceUsageLink, and MPMStandardProcessLink classes are used to work with parent-child associations.
|
Resource
|
WorkCenter
Skill
Tooling
ProcessingMaterial
|
The WorkCenter, Skill, Tooling, and ProcessingMaterial entities represent the MPM resources. In Windchill, resources represent objects such as, personnel, material, equipment and so on, that perform the production activities. Manufacturing resources are the resources needed on the shop floor during the production, maintenance, inspection, or repair of parts.
|
Control Characteristic
|
StandardControlCharacteristic
|
The StandardControlCharacteric entity represents a control characteristic version. In Windchill, the MPMStandardCC class is used to work with control characteristics.
|
|
The subtypeable and softattributable attributes are not supported for the ProcessPlan entity. However, you can add the subentities of the ProcessPlan entity by explicitly configuring the entities in the domain.
|