Splitting and Merging Parts in BOMs Based on Operation Allocations
Windchill 13.1.2.0
Description
You can now manage grouped components—such as bolts and nuts—more efficiently using the Split and Merge Parts in BOM Based on Operation Allocations preference. This enhancement supports flexible allocation of parts across multiple operations without requiring manual splits.
Key Capabilities
• You can allocate occurrences to usage mode process plan.
• Assign fasteners like bolts and nuts as a group and distribute them across multiple operations.
• Automatic Splitting: Allocate quantities from a group to individual operations directly from the 3D tree picker using drag-and-drop actions. The system automatically splits the components and assigns them to the respective operations.
Related Information