Field
|
Description
|
---|---|
Contract Line Item Number
|
Enter the contract line number that requires the delivery of the CDRL or SDRL.
|
Category
|
Select a category for the CDRL or SDRL. Available options include Configuration Management, Provisioning, Technical Manual, or Technical Data Package.
|
System/Item
|
Enter the name of the system or item being acquired that this CDRL or SDRL data supports.
|
Contract Number
|
Enter the contract number for which the CDRL or SDRL is being submitted.
|
Contractor
|
Enter the name of the company submitting the CDRL or SDRL.
|
Field
|
Description
|
||
---|---|---|---|
Data Item Number
|
Enter the number assigned to the data item.
|
||
Title of Data Item
|
Enter the title of the data item.
|
||
Subtitle
|
Enter the subtitle of the data item.
|
||
Authority
|
Enter the number that defines content and format requirements. This may be a Data Item Description (DID) number, military specification number, military standard number listed in DoD 5010.12-L (AMSDL), or a one-time DID number.
|
||
Contract Reference
|
Enter a reference to the tasking in a contract that generates a requirement for the data item, such as a Statement of Work.
|
||
Requiring Office
|
Enter the name of the technical office responsible for ensuring adequacy of the data item.
|
||
DD 250 Requirement
|
Select a requirement for inspection and acceptance of the data item by the government. Options include: DD, DS, LT, NO, SD, SS, and XX.
|
||
Approval Code
|
Select an approval requirement for the draft. A draft must meet this requirement before a final data item can be prepared. Options include: A, AD, AN, D, N, or N/A.
|
||
Distribution Statement
|
Select a requirement for a contractor to use when marking a distribution statement on the data. Options include: A, B, C, D, E, F, or X.
|
||
Frequency
|
Select the desired interval between the data item deliveries. Options include: 1TIME, 2TIME, ANNLY, AP, ASREQ, BI-WE, DAILY, DFDEL, MTHLY, ONE/P, ONE/R, QRTLY, R/ASR, RQ, SEMIA, or WEKLY.
|
||
As of Date
|
Enter the date, or number of days relative to the frequency, as of which the collection of data for this CDRL or SDRL will be cut off.
|
||
Date of First Submission
|
Enter the date on which the first submission of this item is required.
|
||
Date of Subsequent Submission
|
Enter the date on which subsequent submissions are required.
|
||
Due Date
|
Enter the date on which the data item is due.
|
||
Submitted Date
|
Enter the actual date on which the data item was submitted.
|
||
Approval Date
|
Enter the actual date on which the data item was approved.
|
||
Remarks
|
Enter any additional or clarifying information about this CDRL or SDRL.
|