Configuring the Ability to Set a Revision Level (SOLIDWORKS)
A key-value pair in the Windchill preference system allows an administrator to enable users to set a higher revision level than the next label in the revision scheme.
When set to Yes (default), the Allow Override On Create CAD Document preference adds a Set Revision button to the New Revision user interface that allows the user to skip one or more levels of revision during a revise operation. When set to No, the object is revised to a default target/next revision in the series.
Было ли это полезно?