Viewing Primary Materials
After setting the primary material in the BOM and saving or checking in the updated BOM, the following values appear in the BOM header:
• UOM—This value comes from the material object and is not calculated.
• Quantity—This value is a calculated rollup value for each BOM record that specifies the primary material.
• Price—This value is calculated, determined by pricing overrides, the current material-color price from the material pricing table, or the price attribute from the material-supplier attribute.
• Loss %—This value comes from the first primary material record that specifies a loss %
• Total rolled up price—This value is a calculated rollup of the total value for each BOM record that specifies the primary material.
Viewing Primary Material Details
Primary material details appear in the following locations within PTC FlexPLM:
• View BOM
• Advanced view BOM
• View source to season
• Update source to season
• Line sheet viewer
When a primary material is connected to supplier information, it appears as a link to the material supplier details.
When line sheet views are configured, primary material information and related material and material-supplier attributes that are available on the source to season page can be included in the line sheet view.