Model Property
|
Description
|
Model Type
|
---|---|---|
UID
|
The internal unique identifier for the job order material requirement. Autogenerated.
|
Long
|
JobOrderUID
|
The internal unique identifier of a job order.
|
Long
|
MaterialClassUID
|
Identifies the associated material class.
|
Long
|
MaterialDefinitionUID
|
Identifies the associated material definition.
|
Long
|
MaterialLotUID
|
Identifies the associated material lot.
|
Long
|
MaterialSubLotUID
|
Identifies the associated material sublot.
|
Long
|
Description
|
Provides additional information about the material requirement.
|
String
|
MaterialUse
|
* The intended use of the material: Consumed, Produced, Consumable, Destroyed, Disassembled, OperatedOn.
|
Integer
|
StorageLocation
|
The proposed physical location of the material.
|
String
|
Quantity
|
The amount of material that is required.
|
Number
|
QuantityUnitOfMeasure
|
The unit of measure for the Quantity property.
|
String
|
AssemblyType
|
* Indicates whether the assembly is logical or physical. A logical assembly is made up of components that are not necessarily in physical proximity, or actually connected to each other. A physical assembly is made up of components that are actually connected, or are in physical proximity to each other.
|
Integer
|
AssemblyRelationship
|
* Indicates whether the assembly is transient or permanent. In a transient assembly, the relationship between components during production is temporary, for example, a batch kit or materials located on a pallet. In a permanent assembly, the production process does not separate the assembly components.
(If material lots or material sublots are combined, the result is not an assembly, but instead is a new material lot.)
|
Integer
|