KPI OEE Drilldown
The OEE drilldown provides additional details about the information that is used to calculate the overall equipment effectiveness (OEE).
The following information is displayed in the OEE drilldown:
• OEE detail—Displays multiple time considerations for the equipment. Each line represents a new loss of available time based on specific category.
• Availability detail—Displays the maximum available time of the asset for production. You can find more detail in the Availability drilldown.
• Performance detail—Displays the ideal production metric, compared to the actual total production and slowdown losses, based on the operating time. You can find more detail in the Performance drilldown.
• Quality detail—Displays the total production compared to the good quality production and waste. Waste is typically production that is rejected due to nonconformity with the quality requirements. You can find more detail in the Quality drilldown.
OOE
The OOE drilldown shows additional details about the information used to calculate the overall operation effectiveness (OOE). The OOE KPI calculation includes unscheduled time, such as time when the plant is closed, while looking at the total operations time as the maximum. The OOE detail portion of this drilldown includes an additional line showing whether the plant is open or closed. The rest of this drilldown is the same as the OEE drilldown.