Associating Equipment to Shift Schedules
Associate each piece of equipment for which KPIs are to be calculated with a shift schedule.
1. In ThingWorx Composer, navigate to the Thing representing the piece of equipment, for example Asset_Asset1.
2. Under Properties and Alerts, search for the ShiftScheduleUID property.
3. Click Set value, and enter the UID of the shift schedule applicable for this piece of equipment.
4. Click Checkmark icon.
5. Click Save to save the piece of equipment.
* 
If no ShiftScheduleUID is specified on a piece of equipment, the system assumes that the equipment is using the "default" shift schedule. As a best practice, always associate equipment for which KPIs are to be calculated with a shift schedule.