00188395
|
068496
|
The LJS/JDM event date moved to the next day when the user clicked Calculate button during a work order dispatch. This behavior caused incorrect scheduling and impacted dispatch accuracy. This issue occurred as the system added the event duration to the activity date twice during calculation.
|
Dispatch Console
|
25.20000.32
|