Creating a requires dependency
You can create a Requires Dependency between Variation Points and Variants.
To create a requires dependency:
1. Open the diagram on which you want to create the Requires Dependency.
3. On the Variant Diagram or Variability tab, click the
Requires Dependency button.
4. Click the requiring Variation Point or Variant.
5. Click the required Variation Point or Variant.
6. If you want the Requires Dependency to be bidirectional, on the Options tab of the Requires Dependency's Property Pages, select the Bidirectional check box.