Done Node
The Done node indicates the ending of an Action sequence.
Creating a Done Node
To create a Done node
1. On the System Structure Diagram ribbon toolbar, in the Action Controls section, click the Done button.
2. On the diagram, click inside any one of the following items.
Action definitions
Action usages
Perform action usages
If actions
While loop actions
For loop actions
This creates the Done Node in the diagram. You can use the Succession connections to connect other Action symbols to the Done Node.
Was this helpful?