|
Column
|
Description
|
|---|---|
|
Status
|
The status of the action: Not Started, In Progress, At Risk, Overdue, or Complete. The action status is manually set.
|
|
Title
|
The title for the action.
|
|
Equipment
|
The work center or work unit associated with the action.
|
|
Loss Category
|
The high-level loss category associated with the action: Scrap, Planned Downtime, Unplanned Downtime, Changeover, Speed Loss, Small Stops, Unknown.
|
|
Reason
|
The specific loss reason associated with the action.
|
|
Owner
|
The owner of the action.
|
|
End Date
|
The target end date of the action.
|
|
|
If a Loss Category filter is applied, the data shown in the Total Loss Hours chart includes data from loss events for which the loss category on the event matches the applied Loss Category filter. The event category for those loss events is not considered for this chart.
This is different from the trend charts shown in Performance Analysis. Those trend charts show data from loss events that match the event category, loss category, and loss reason you selected while navigating through the waterfall and Pareto charts to reach the trend chart.
|